
dimanche 15 mai 2011
dimanche 8 mai 2011
mardi 26 avril 2011
dimanche 6 février 2011
Color
Warning up
The weather was a bit better this week end, so epoxy could be mixed again. Two more strips on the canopy and some other work on the center board trunk. Sanding under the hull is no fun...
I took some time to install the stanchions and life line. It does not look too bad! I went the cheap way for that piece, as stanchions can be very expensive... I used 1" x 20" SS pipe and some handrails bases.
I took some time to install the stanchions and life line. It does not look too bad! I went the cheap way for that piece, as stanchions can be very expensive... I used 1" x 20" SS pipe and some handrails bases.vendredi 21 janvier 2011
Winter time
It is cold in Houston, not the right time for epoxy... So progresses are slow.
I have redesigned the centerboard lifting system a bit. The original design was difficult to operate and I was not confortable with it. I have installed a 600 lbs manual winch borrowed to Kerness trailer with a web strap. There is a key slot in the centerboard top, where the strap is kept in place with a pin. Very efficient and simple design and no more issue with lifting the centerboard.
I had to use my sander a bit more, to make the center board move freely in the trunk.

The ruder is ready... almost!


In the front, the space below deck is water tight.


All the best for 2011...!
I have redesigned the centerboard lifting system a bit. The original design was difficult to operate and I was not confortable with it. I have installed a 600 lbs manual winch borrowed to Kerness trailer with a web strap. There is a key slot in the centerboard top, where the strap is kept in place with a pin. Very efficient and simple design and no more issue with lifting the centerboard.
I had to use my sander a bit more, to make the center board move freely in the trunk.
The ruder is ready... almost!

On each side of the trunk, there are 2 hatches and a couple fastners to retain the lead in place. I will place the lead in heavy fabric bags and fasten them to the bottom with straps.

In the front, the space below deck is water tight.

The canopy is slowly covered, day after day, with 40 mm x 12 mm strips. Long process, but it is beautifull.

All the best for 2011...!
samedi 23 octobre 2010
Center board
Last week-end was a busy one for Lady C....

There was this old boat vendor on the port of Brest, who told me once a motto he said was coming from our old neighbors, accross the channel. He was the kind of old Breton that do not really like the neighbors, but respect them as great sailors. So I was going to start the installation of the legs on my boat back home and I needed to drill 4 holes, about 1/2" in the hull. Humm, the kind of thing, I do not like much. So the old man told me: "as the englishman says, it is better to measure twice and drill once, than the opposite". So, I wanted to try the big centerboard in place before we glued in place the final soles pieces around the trunk. If I had to modify the trunk, better to know it now rather than later.
So the first thing was to lift the boat of its cart. This was done with the tack of Lady C. on one side and the tack of KerNess on the other side and a securing web. All was attached to the garage roof framing.
Then the centerboard was attached to the cart, ready to get in the trunk. The cart was pushed underneath the boat, centerboard inside the trunk.

Last piece was to lower the boat and have the kids put the axis in place through the trunk and centerboard.
It all went very well and we were able to test the lifting mechanism. Hughh it's heavy. I may have to rethink it a bit. At this moment, we have 4 strings, I may be able to add one more.

There was this old boat vendor on the port of Brest, who told me once a motto he said was coming from our old neighbors, accross the channel. He was the kind of old Breton that do not really like the neighbors, but respect them as great sailors. So I was going to start the installation of the legs on my boat back home and I needed to drill 4 holes, about 1/2" in the hull. Humm, the kind of thing, I do not like much. So the old man told me: "as the englishman says, it is better to measure twice and drill once, than the opposite". So, I wanted to try the big centerboard in place before we glued in place the final soles pieces around the trunk. If I had to modify the trunk, better to know it now rather than later.
So the first thing was to lift the boat of its cart. This was done with the tack of Lady C. on one side and the tack of KerNess on the other side and a securing web. All was attached to the garage roof framing.

Then the centerboard was attached to the cart, ready to get in the trunk. The cart was pushed underneath the boat, centerboard inside the trunk.

Last piece was to lower the boat and have the kids put the axis in place through the trunk and centerboard.
It all went very well and we were able to test the lifting mechanism. Hughh it's heavy. I may have to rethink it a bit. At this moment, we have 4 strings, I may be able to add one more.I also took the opportunity to trim the trunk to the outside shell shape and tapped to layer of cloth from inside the trunk to outside hull.
Next week, we need to glue the sole in place and get ready for the decks...
Inscription à :
Articles (Atom)





